Subway

Home / Project Case / Subway

Nanchang Metro Line 2

2023-08-23
Nanchang Metro Line 2

Project Background:

Commencing Time:December 11th, 2014                            

Opening Time:December 18th, 2017

Investor:China Railway Tunnel Group                

Project Introduction:

Nanchang Metro Line 2, connecting the core areas of the new and old cities of Nanchang City, Jiangxi Province, covering Jiulong Lake, Hongjiaozhou, Honggutan, Changdong and the core and south area of Changdong Old City, covering a length of 41.6 kilometers,  divided into 34 stations, a total of 22 trains were set up in the first phase of Nanchang Metro Line 2, consisting of 6 aluminum alloy type B trains, the maximum capacity of the single train is 2062 people. The first four trains in the first phase of line 2 are manufactured in Changchun Rail bus Co., Ltd., and the subsequent trains will be produced and assembled in Nanchang Central Railway equipment Co., Ltd.,  which is expected to finish in October 22nd 2017.  all the lighting system of the passenger room of Nanchang Metro Line 2 will adopt the domestic advanced LED light source owning the adjustable  brightness consistency ,  energy saving and environment protection, besides, the service life is long. At the same time, the air conditioning adopts frequency conversion, Heat pump technology, advanced performance, quickly adjusting the temperature of the carriage, more efficient. In addition, the dynamic map is displayed by LCD display screen, Compared with the LED dot display on Line 1, the display content is more intuitive and perfect. At the same time, the interior of the train compartment of Line 2 is optimized. There is a special seat for love in the passenger room, and the technical space condition for the installation of air purifier is reserved.

.


Product Details Used in the Project