Subway

Home / Project Case / Subway

Nanning Metro Line 2

2023-08-23
Nanning Metro Line 2

Project Background:

Starting Time:December 11st, 2014                                

Opening Time:December 28th, 2017

Investor:China construction co., Ltd. 

Project Introduction:


Nanning rail transit line 2 is the backbone line connecting Nanning city in the north and south direction. The whole line is laid by underground line, its south starts from jade cave, through Yinhai Avenue, Starlight Avenue, Chaoyang Road, Youai Road, Anji Avenue and so on to the north to Xijin. The total length of the line is 21.2 km. there are 18 underground stations with 6 transfer stations, 1 integrated base and two main substations. The preliminary design estimate is fifteen billion five hundred and forty-six million yuan. The specific stations of Line 2 are: Yudong Station-Jinxiang Station-Shitzitang Station-Sha Tin Station-Wuxiang Avenue Station. Jiangnan passenger Station-Baisha Avenue Station-Shizhuling Station-Fujian Park Station-Gymnasium Station-Chaoyang Square Station-Railway Station Station-Yau Oi Station-Yau Oi North Station-Xiuxiang Station-Sulu Station-Anji passenger Station-Xijin Station.



Product Details Used in the Project