Hotel

Home / Project Case / Hotel

Guangzhou Kempinski hotel

2023-09-11
Guangzhou Kempinski hotel

Project Background:

Starting Time:January 1st, 2013                            

Opening Time:January 10th, 2021

Investor:Guangzhou Dean Real Estate Co., Ltd.                 

Interior design:Singapore HBA Design Consulting Co., Ltd.


Project Introduction:

Guangzhou Kempinski Hotel-style apartment is located in construction six roads commercial center, yuexiu district. With the superior location,dean real estate cooperate with Xinjia HBA Design Consulting Co., Ltd., subsequently, taken over the operation by Germany Kempinski Hotel Management Company, The total floor area is nearly 40,000 square meters, the ground has 23 floors, the first floor to the second floor for commercial purposes, the third floor for the club, including the swimming pool, small conference rooms, the 4th floors for the core tube and overhead floor. The 5th to 23rd floors for hotels, a total of 261 guest rooms.


Product Details Used in the Project