Hotel

Home / Project Case / Hotel

Baiyun International Conference Center Phase II (Yunzhu Hotel)

2023-09-11
Baiyun International Conference Center Phase II (Yunzhu Hotel)

Project Background.


Start of construction:2018-10-30                                  


Opening date:2022-12-30 


Interior Design:CCD DESIGN


Guangzhou Baiyun International Convention Centre has a total construction area of 316,000 square metres The main building includes three conference and exhibition centres, BCD, and two Oriental International Convention Hotels, A and E. The convention centre has more than 170,000 square meters of conference space, including 60,000 square meters of exhibition space and a total of 65 conference halls of various types, including a 2,500-seat Century Assembly Hall, a 250-seat Presidium Hall and medium-sized conference halls, a 1,200-seat Lingnan Conference Hall, two 500-seat international conference halls, 21 prefecture-level named medium-sized conference halls and other small and medium-sized meeting rooms, the Oriental Ballroom, etc. The venue is equipped with simultaneous interpretation system, electronic voting system, central control system, conference speech system and sound control system, conference audio and video electronic recording system and other international advanced facilities and equipment, which can meet the needs of different scales and types of meetings. The Oriental International Conference Hotel is divided into the South Block (Building A) and the North Block. The two blocks occupy an area of 140,000 square metres and have 1,112 guest rooms with complete supporting facilities and services.



Product Details Used in the Project