Project Background:
Starting Time: December 11th, 2014
Opening Time: December 18th, 2019
Investor: China Railway Tunnel Group
Project Introduction:
The line of Xi'an North to Airport Intercity track Project (Airport Line) starts from the North Square of Xi'an North Railway Station, then turns north across the Weihe River, passes through the New Town of Qinghan in Xixian New District, and the New Town of Airport. Airport planning east terminal to destination terminal T2/T3 airport station. The line overall length is 29.28 km, in which the length of elevated line is 18.3km, the length of underground line is 8.14km, and the length of ground line is 2.84km. there are 10 stations, including three underground stations: North passenger Station, East Terminal Station, Airport Station; Six elevated stations: Shangji Road, Ma Dong, Changling, Flag Village, Art Center and Airport New City Station; ground Station 1: Qinghan Commercial District Station. Set up 1 depot of Art Center (located on the south side of the planning block of the airport new city, north of the tourist road, the length of the exit line is 0.94km, the length of the entry line is 0.88km), the main substation is 2, the control center is 1, and the construction period is 4 years.