Zhengzhou Metro (Line 7 (Phase 1), Line 12, Line 16)

2023-08-23
Zhengzhou Metro (Line 7 (Phase 1), Line 12, Line 16)

Project Background

Starting Time:January 11th, 2016                              

Opening Time:December 31st, 2017

Investor:China Railway Tunnel Group


Project Introduction:

ZhengZhou Metro refers to urban rail transit serving Zhengzhou City, Henan Province, China. Its first line was opened for trial operation on December 28, 2013, making Zhengzhou become the 18th city with subway in China. According to the information of the official website of Zhengzhou Rail Transit in October 2017, there are 3 open operation lines, namely Line 1, Line 2 and Suburban Line, all using the subway system, with a total length of 95.4 kilometers; a total of 61 stations Among them, there are 2 transfer stations, namely Zijingshan Station and South Fourth Ring Station. According to the information of the Zhengzhou Rail Transit official website in November 2017, there are 7 (segments) of the lines under construction, which are the second phase of Line 2, the first phase of Line 3, the second phase of Line 3, the 5th line, 10 Line 2, Line 11, and the second phase of the suburban line, the mileage under construction is 182.748 kilometers; in the long-term planning, there are 21 lines. In 2017, the annual passenger traffic of Zhengzhou Rail Transit was 280 million passengers, and the average daily passenger traffic exceeded 767,100. In 2016, its annual passenger traffic was 144 million passengers, and the average daily passenger traffic exceeded 396,200. In 2016, Zhengzhou Rail Transit Line 1 (extension line), Zhengzhou Rail Transit Line 2 (Phase II), Zhengzhou Rail Transit Line 3 (Phase 2), Zhengzhou Rail Transit Line 9 (Shenzhen Xinzheng Airport to Minhang District Convention and Exhibition City Section), Zhengzhou Rail Transit Line 10, Zhengzhou Rail Transit Line 11, Zhengzhou Rail Transit Line 14 (Phase I) commenced construction . On January 12, 2017, Zhengzhou Rail Transit Line 9 (the first phase of Shilihe Station to Xinzheng Airport Station) and the second phase of Zhengzhou Rail Transit Line 1 were opened for trial operation. It is expected that within 2017, Zhengzhou Rail Transit Line 6, Zhengzhou Rail Transit Line 8 (Phase I) and Zhengzhou Rail Transit Line 9 (Second Phase of Hongshan Road Station to Shilihe Station) will start construction. It is expected that within 2018, Zhengzhou Rail Transit Line 7 (Phase I), Zhengzhou Rail Transit Line 12, Zhengzhou Rail Transit Line 16, and Zhengzhou Rail Transit Line 17 (Phase I) will start construction.


Product Details Used in the Project