Subway

Home / Project Case / Subway

Nanchang Metro Line 3

2023-08-23
Nanchang Metro Line 3

Project Background:

Strating Time:December 30th, 2015                              

Opening Time:December 30th, 2020

Investor:China Railway Tunnel Group            

   

Project Introduction:

Nanchang Subway Line 3 is a rail transit line under construction in Nanchang city. It is the only line in the initial stage of Nanchang rail transit network that does not pass Ganjiang River, and will become the third subway line in operation in Nanchang city.The route plan is generally in the shape of "7" written backwards. It passes through Nanchang County, Qingyunpu District, Xihu District, Donghu District and Qingshan Lake District, with a total length of about 28.5km.The route has a north-south direction in Nanchang County, Qingyunpu district, Xihu District and Donghu District, and an east-west direction in Qingshanhu District.In the first phase of the project, the southwest terminal starting and ending stations are Yinhe North Station and the east terminal starting and ending stations are Jingdong Dadao station. There are 22 stations, all of which are underground stations.The South Extension line starts from Henggang Station and ends at Yintriangle North Station (excluding it). There are altogether two stations with a total length of 2.4KM. On December 30, 2015, The construction of Nanchang Rail Transit Line 3 was officially started.On December 30, 2019, The entire line of Nanchang Subway line 3 was opened to the public.The full line is scheduled to open in December 2020.


Product Details Used in the Project