Xi \'an Metro Line 14

2023-08-23
Xi \'an Metro Line 14

Project Background:

Starting Time: September 28th, 2019                               

Opening Time: July 30th, 2021

Investor: China Rail Tunnel Group    


Project Introduction:


Xi 'an subway line 14 from xi 'an xianyang international airport, east to the international harbor area He Shao village, total length of 42.96 km, along the east road in turn - learning centre (building materials north road) - developing road laid, set He Shao village station, port, double walled avenue station, three thus stop (transfer to line 3), sports center (planning transfer to line 13), xin wang station, station of xi 'an university of technology (transfer to no. 10 line under construction), it is one's post to better men standing with eight stations (excluding north district north square).


Among them, there are 3 transfer stations, all of which are underground stations. The maximum station distance of this line is 3.517km (shangxian Road to Xuffu Road interval), and the minimum station distance is 1.147km (Gangwu Avenue to Heshao Village interval). The average station distance is 1.75km.1 parking lot (Junma parking lot, north of East Road and east of Middle Road), 1 main substation (intersection of Taihuabei Road and Xuhui Road), vehicle depot and control center Shared with airport intercity (Art Center vehicle section and Wei Henan Control Center).


Product Details Used in the Project