Subway

Home / Project Case / Subway

Luoyang Metro Line 2

2023-08-23
Luoyang Metro Line 2

Project Background.


Start of construction:2016-8-19                                   


Opening time:2021-12-30


Investor:China Railway Tunnel Group


Luoyang Rail Transit Line 2, a metro line under construction in Luoyang City, Henan Province, China, is expected to open for operation at the end of 2021 for Phase I (Er Qiao Road Station to Bailitang Station), marked in bean green.


The first phase of Luoyang Railway Line 2 starts from Erqiao Road Station in the old city area in the north, passing through the old city area, Xigong District and Luolong District, and ending at Bailitang Station in Luolong District in the south, which is the backbone of the north-south traffic line in Luoyang.


As of April 2021, the first phase of Luoyang Rail Transit Line 2 is 18.2 km long, all underground; there are 15 stations, all underground; trains use 6-section B-type trains.


Product Details Used in the Project