Subway

Home / Project Case / Subway

Shaoxing Metro Line 1

2023-08-23
Shaoxing Metro Line 1

Project Background.


Start time:2014-12-16                                  


Opening time:2020-12-30


Investor:China Railway Tunnel Group


Shaoxing Railway Line 1 is the first metro line completed and operating in Shaoxing City, Zhejiang Province, China. It will open for operation on 28 June 2021 for the Keqiao section (China Light Textile City Station to Girl's Bridge Station), marked in red.


The Keqiao section of Shaoxing Railway Line 1 starts from the Maiden Bridge Station in Xintang Street, Xiaoshan District, Hangzhou City in the north, and runs through the two administrative districts of Xiaoshan District and Keqiao District to the China Textile City Station in Keqiao District, Shaoxing City in the south.


As of July 2021, the Keqiao section of Shaoxing Railway Line 1 will be 20.3 km long; there will be 10 stations, including 6 underground stations and 4 elevated stations; the train will be a 6-section B-type train with a maximum speed of 100 km/h; there will be 1 vehicle section, 1 car park and 1 control centre.


Product Details Used in the Project