Office Building

Home / Project Case / Office Building

Shenzhen Nankai Mansion

2023-08-23
Shenzhen Nankai Mansion

Project Background:

Starting Time:December 24th, 2015                                 

Opening:December 31st, 2017

Investor:Citic Nanshan Group Co., Ltd.                 

Decoration units:China construction third bureau two co., Ltd.

Project Introduction:

The green construction and safe and civilized construction of Nankai Mansion project can also be noted. In the green construction aspect, the project has adopted the turning over steel plate road, the solar energy lamp, the photovoltaic power generation, the landscape pool and the greening, excellent practices such as concrete waste recycling and garbage pipes, automatic sprinkling, on the other hand safety and civilization construction, intelligent access control system, standardized safe passage and protection, multimedia toolbox and safety experience area, tower crane collision prevention, elevator face recognition, UAV aerial photograph etc. promise the safety of the project. The total construction area of Nankai Building is 82126.53, the underground 3 floors, the ground 33 floors, the building height 158.1 mm. it is a comprehensive building that integrates logistics and office. Upon completion, the project will become a landmark building in the Chiwan area. It is reported that the contractor of the project, China construction third bureau two co., Ltd., is a top 500 company in the world. The company has been awarded 26 State Excellence Awards by Luban and 192 high-quality projects above the provincial and ministerial level. There are 38 awards for scientific and technological achievements above the provincial level, of which 2 are national science and technology step awards, 91 are authorized state patents, and 3 are national industrial laws.

Product Details Used in the Project