Airport

Home / Project Case / Airport

Terminal T1 of Nanjing Lukou Airport Expansion

2023-08-23
Terminal T1 of Nanjing Lukou Airport Expansion

Project Background

Starting Time: September 22rd, 2018                              

Opening Time:December 31rd, 2021


Project Introduction:

After the renovation and expansion of terminal T1, the number of near seats increased from 13 (4C5D4E) to 21 (15C3D3E), and the number of traditional check-in counters increased to 96.Terminal 1 contains the main building, north and south corridor.Only the main building and the north corridor of terminal 1 of this project are renovated and expanded.According to the building and structure, the terminal will be divided into 5 areas: the main building, north connected corridor, north corridor, the end of the corridor and south corridor.The reconstruction plan includes two parts: new construction and reconstruction.Main floor layout there are four ticket islands in the departure hall, each with 24 counters.The security check area is located after the departure hall, and 30 passages to the mezzanine are mainly located on the empty side. The main function is the passage connecting the boarding bridge and the baggage claim hall on the first floor.Passengers enter the arrival channel via a soothing ramp from the boarding bridge, which is flanked by a curtain wall facing the empty side apron, and the automated walkway to the main building.At the end of the north finger corridor of the mezzanine, there is an airport lounge, where the departing passengers wait for their flight.

Product Details Used in the Project